Methods / Room Heat Load
How RokBench checks this

Electrical Room Heat Load

How equipment losses are estimated and turned into BTU/hr, tons of cooling and ventilation airflow.

1. What this check does

Estimates the heat released by each piece of equipment at its operating load, adds other gains and a design margin, and converts the total into BTU/hr, tons of refrigeration, a count of air-conditioning units with spares, and the airflow that would remove the same heat by ventilation.

2. Inputs used

3. Formulas and assumptions

Equipment losses

Cabinets
W=(W/A)⋅Irated⋅LF2W = (W/A)\cdot I_{\text{rated}}\cdot \mathrm{LF}^2

Losses at rated current, scaling with current squared.

VFD, charger
W=kW⋅LF(1η−1)W = \mathrm{kW}\cdot \mathrm{LF}\left(\dfrac{1}{\eta} - 1\right)
UPS
W=kVA⋅PF⋅LF(1η−1)W = \mathrm{kVA}\cdot \mathrm{PF}\cdot \mathrm{LF}\left(\dfrac{1}{\eta} - 1\right)

PF 0.9.

Transformer (DOE efficiency at test load Lt)

Loss at test load
Pt=kVA⋅Lt(1η−1)P_t = \mathrm{kVA}\cdot L_t\left(\dfrac{1}{\eta} - 1\right)

Lt = 35% LV dry-type, 50% liquid and MV dry-type (10 CFR 431.196).

Split
PNL=Pt2PLL,rated=Pt/2Lt2P_{NL} = \dfrac{P_t}{2} \qquad P_{LL,\text{rated}} = \dfrac{P_t/2}{L_t^2}
At load
W=PNL+PLL,rated⋅LF2W = P_{NL} + P_{LL,\text{rated}}\cdot \mathrm{LF}^2

Room

Total
Wtotal=(∑W+Wother)(1+m)W_{\text{total}} = \Bigl(\sum W + W_{\text{other}}\Bigr)(1 + m)
Cooling
BTU/hr=3.412 Wtotaltons=BTU/hr12,000units=⌈tonsunit size⌉+spares\mathrm{BTU/hr} = 3.412\,W_{\text{total}} \qquad \text{tons} = \dfrac{\mathrm{BTU/hr}}{12{,}000} \qquad \text{units} = \left\lceil \dfrac{\text{tons}}{\text{unit size}} \right\rceil + \text{spares}
Ventilation
CFM=BTU/hr1.08 ΔT°F\mathrm{CFM} = \dfrac{\mathrm{BTU/hr}}{1.08\,\Delta T_{°F}}

Sensible heat, standard air.

Cooling power
kWin=Wtotal/1000COP\mathrm{kW_{in}} = \dfrac{W_{\text{total}}/1000}{\mathrm{COP}}

COP = DOE minimum NSenCOP for the CRAC class, or entered.

Symbols
W/A, IratedW/A,\ I_{\text{rated}}Loss per ampere at rated current; rated currentW/A, A
LF\mathrm{LF}Load factor (actual over rated)
η, PF\eta,\ \mathrm{PF}Efficiency; power factor
Lt, PtL_t,\ P_tDOE test load fraction; transformer loss at that load—, W
PNL, PLLP_{NL},\ P_{LL}No-load (core) loss; load (copper) loss at rated loadW
mmDesign margin
ΔT°F\Delta T_{°F}Supply-to-room air temperature difference°F
COP\mathrm{COP}Sensible coefficient of performance of the cooling unit
Flow diagram: panels, MCCs, transformers, UPS and VFDs produce watts; add other gains and margin; convert to BTU/hr and tons; divide by unit size to get running plus spare units.
Figure 1. From equipment losses to tons of cooling and AC units.
Graph of loss versus per-unit loading: a flat no-load loss line and a parabolic load loss, summed; DOE test points at 35 and 50 percent marked.
Figure 2. Transformer losses: fixed no-load loss plus load loss growing with the square of loading.
Graph of cabinet loss versus current with loss at rated current marked.
Figure 3. Cabinet losses scale with the square of current.

4. What is NOT checked

5. Reference standards

Pointers only; consult the edition adopted by your authority having jurisdiction.

6. Validation cases

These worked examples run through the engine on every change; the expected values come from the cited source. All cases: Validation.

Electrical room: switchboards, panelboards, 75 kVA dry-type transformer, 100 kVA UPS room/heat · Hand calculation

Pass

Source: Hand calculation from the published loss equations; transformer efficiency 98.60% at 35% load from 10 CFR 431.196 (three-phase LV dry-type, 75 kVA) — Switchboards 0.6·2000·0.8²·2 = 1536 W; panelboards 0.4·225·0.64·4 = 230.4 W; transformer Pt = 75000·0.35·(1/0.986 − 1) = 372.7 W → 186.4 + 1521.3·0.64 = 1160.0 W; UPS 100·0.9·0.8·1000·(1/0.95 − 1) = 3789.5 W. (6715.9 + 500)·1.1 = 7937 W = 27,084 BTU/hr = 2.26 tons.

QuantityExpectedRokBenchErrorResult
equipmentW671667160%Pass
totalW793779370%Pass
btuPerHr27084270840%Pass
tons2.262.260%Pass

7. Known issues and changes

See the Engineering Notes. Try the tool: Electrical Room Heat Load.