Methods / Resilience Score
How RokBench checks this

Resilience Score

A relative 0–100 index for comparing how well each load is supplied. It is not an availability figure or a probability.

1. What this check does

For every load and every node marked critical, RokBench removes each other node in turn and checks whether the load is still energized, under failure conditions and under planned maintenance. It also counts how many independent supply paths reach the load. These results are combined into a relative score and a color band.

2. Inputs used

3. Formulas and assumptions

Energized reachable from any in-service source through in-service nodes and usable connections Failure normally closed connections + automatic transfers (normally open connections into an ATS or STS) Maintenance failure rules + planned switching (any normally open connection, such as a bus tie) Upstream elements nodes that lie on some supply path to the load Failure survival share of upstream single-element outages the load survives under failure rules Maintenance survival same, under maintenance rules Independent paths number of supply paths that share no node, from any source to the load Score weighted combination of the three, limited when a single point of failure exists

4. What is NOT checked

5. Reference standards

Pointers only; consult the edition adopted by your authority having jurisdiction.

6. Validation cases

Hand-calculated cases run on every change. See Validation.

7. Known issues and changes

See the Changelog. Try the tool: Workbench.

Screening toolfor licensed professionals. Not an engineering service. See Disclaimer.